Conversion / Modification / Repair Project
All the vessels may need to be converted to different concept as per as the market condition.
Also some equipments or arrangement may need to be modificated due to rule changes or different operational purpose. In such circumstances the three most important criteria are; revision time, total workmanship and material/equipment cost . Due to these criterias all the Project studies of revision are to be completed before the vessel. In this regard Navis Design and Engineering provides ;
- Onboard survey for predetermination
- Preparation of outline spec for the revision
- Preparation of the concept design and getting Approval from class society
- Preparation of the production drawings and the detailed material list
- On site survey during conversion / modification