5700DWT Oil/Chemical Tanker that is under construction in Hercelik Shipyard/Yalova has been launched successfully on 29 July 2017.
M/F JAMBO has been loaded on the dockwise vessel, and now on the way to Mombasa. The sister vessel M/F SAFARI is still under construction and will be completed in September.